    Test a flow

    Exercise completion, timeout recovery and approval in the test company.

    On this page

    Prepare the environment

    Use the test base address and connections assigned to the test company. Read the selected flow version and record the order reference before starting. Keep test triggers separate from production event sources.

    Run the cases

    • Complete an order below the branch limit and confirm approval is skipped. Repeat at exactly the limit.
    • Use an order above the limit, wait for approval and verify that only an authorized account can decide.
    • Make the ERP call exceed its time limit. Confirm that the run opens its next attempts after the pause, then retry once it stops and confirm that the order is not duplicated.
    • Cancel an active run and verify that later responses cannot complete it.

    Record the result

    Retain run and correlation identifiers, the pinned version and the observed final state. Inspect step attempts and downstream records, not just the operation receipt. Resolve a failed case before enabling the production trigger.